The Ackerman-Estvold team began work on this project in 2006 and was intimately involved in the New Town Main Street and NE Truck Reliever Route Projects until the completion of both projects in 2014/2015. During the preliminary design of the Main Street project, western North Dakota exploded with oil activity and New Town found themselves in the heart of the Bakken oil field development. Main Street in New Town quickly became the main thoroughfare connecting ND Highway 23 to both ND highway 1804 and the Four Bears Bridge crossing Lake Sakakawea. With the imperative need to reduce traffic on Main Street, the New Town NE Truck Reliever Bypass project was advanced ahead of the Main Street project. Doing this provided a sufficient alternate route that could be utilized during the Main Street Reconstruction and provide a high level of service to the traveling public.

 

Ackerman-Estvold completed the design of the New Town Northeast Truck Reliever Route (ND Highway 23B) in 2013. This project consisted of a new 3.2-mile rural 2-lane roadway that included turn lanes, traffic signals, intersection lighting, pavement marking, signing, drainage, wetland mitigation, and cultural resource avoidance measures. Over 1,000,000 CY of excavation and borrow was required to complete the project along with 128,000 tons of aggregate base, 33,000 tons of hot mix asphalt, 36,000 SY of 12.5” concrete pavement and 4,700 LF of pipe. This project also included right-of-way acquisition with the NDDOT and the Ackerman-Estvold team sharing the right-of-way responsibilities.

Ackerman-Estvold’s role included the traffic operations study, noise analysis, environmental permitting, right of-way design, roadway design, hydraulic analysis and drainage design, public involvement coordination including conducting public meetings, and overall project coordination of the design and environmental assessment of the project. The environmental assessment led to a Finding of No Significant Impact (FONSI) of the preferred alternative, which required Federal Highway Administration and Bureau of Indian Affairs approval. The project also involved coordination with the City of New Town and the Three Affiliated Tribes along with other local, state, and federal agencies. Construction of this $18.9 million project was completed in 2014.

Simultaneously, the Main Street project design was underway so that as soon as the Bypass was completed, construction work could begin on the Main Street project. The New Town Main Street Project consisted of the complete reconstruction of a 1/2 mile long urban section of roadway from ND 1804 to East Avenue, including the frontage roads and side streets. Preliminary Engineering responsibilities included a traffic operations study, preliminary surveying, and a documented CatEX. The design phase included roadway geometrics, storm drain, sidewalks, curb & gutter, medians, signing, pavement markings, and lighting. Additionally, water and sewer infrastructure was upgraded for utilities. The Ackerman-Estvold team assisted with right-of-way needs required to complete the project. During construction, the Ackerman-Estvold team worked as the City’s representative ensuring construction and progress were in the best interest of the City of New Town.  Construction of the project was completed during the 2015 construction season.

new town east truck reliever route and main street reconstruction

NEW TOWN, NORTH DAKOTA

Ackerman-Estvold provided design and construction engineering services for this Williams County 10 mile full reconstruction project of a gravel roadway which included sliver widening and grade corrections. The project included 94,000 CY of borrow, 135,000 tons of aggregate base, 61,000 tons of asphalt, 2,850 LF of CMP and RCP culverts, bridge replacement with a triple 14 Ft x 8 Ft box culvert, signing, rumbles, and pavement marking. The team performed all design aspects including H&H, permitting, and wetland delineation. The design started in October 2023 with bid opening of March 2024 with total cost of $15.1 million. The project was completed in October 2024 under budget totaling $14.7 million.

williams county road 19 bridge replacement and paving

WILLIAMS COUNTY, NORTH DAKOTA

  • Facebook icon
  • Twitter icon
  • LinkedIn icon
  • Instagram icon

Minot, North Dakota

1907 17th St SE

Minot, ND 58701

701.837.8737

Fargo, ND

3315 45th St S

Suite 100

Fargo, ND 58104

701.551.1250

Williston, North Dakota

3210 27th St W

Suite 200

Williston, ND 58801

701.577.4127

Boise, Idaho

7661 West Riverside Dr

Suite 102

Garden City, ID 83714

208.853.6470

Ackerman

Surveying

Minot, ND

701.838.0786

Williston, ND

701.577.4127

CONTACT US:

Success! Message received.

© Ackerman-Estvold 2025

bottom of page